Embedded Expansion Joint to UK Highway Standard CAD 357
BP1 is an embedded joint containing polyethylene placed in the joint space flush with the concrete surface. The remaining surface on the deck is then primed using PMCS / 01. Then, a 2mm nominal thickness PmB waterproofing layer is sprayed over the entire area. Within 4 hours, 300 mm of coating is sprayed on the existing 2 mm waterproofing layer and the final surface is obtained.
Benefits of the System:
- Movement Range +/- 10mm
- Highways England, Transport Scotland, Ireland Welsh Government Infrastructure Department – Approved product
Applications:
- Bridges
- Roads

